Switching Time and Specificity in PCB Assembly
Electronic product assembly faces challenges due to the large number and variety of components and short product life cycle, leading to complex production scheduling. The assembly line consists of high-speed and multi-functional placement machines, with switching times being a critical factor in the process. Production scheduling is divided into board-level and group-level to optimize efficiency and minimize switching times.